Huge steam and pneumatic hammers were being Utilized in that venture. But after the independence of Bangladesh in 1971, the engineering didn't moved forward. This pile is produced according to the actual size with the bored soil. So, lots of time and the money is saved in this piling program. https://fordz826kmn7.blogdomago.com/profile