Three. Right after rig positioning, push the casing into the ground. Drive steel casing into a minimum amount a depth of 1 m underneath the bottom stage to get lateral loads and movements at site. The metal casing also overcome troubles on account of groundwater throughout piling. In this case https://erice283aul1.aboutyoublog.com/profile